If you are unable to fill this form please call us or WhatsApp for information

Architect Requirements

Architect Form
If Plot Size different ( Example dimensions 35 x 65 )
Project Facing (Plot or Building)
Basement Required
Front Elevation Type
Please Select Drawings

Notes*

-For the work to be delivered, payment must be received in advanced
-Contract time period is 10 Days after layout and 3D Front Elevation design in final
-Each Payment must Receive in Advance
-Steel Structural Drawings would be charge Separately 5/sqft
Stage 1
layout design and front elevation final
Stage 2
All Working Drawings Complete

LDA Submission Drawings is only for Lahore