Model Town Society Lahore
Model Town Society (MTS) is one of the most well-planned and prestigious residential areas in Lahore, Pakistan. It was established in 1921 by Dewan Khem Chand, with the idea of creating a garden-town style neighborhood. It’s governed by the Model Town Cooperative Housing Society
A Quick History:
Founded in: 1921
Founder: Dewan Khem Chand, an Indian civil servant and visionary.
Purpose: He wanted to build a “garden town” – a peaceful, green residential community away from the noise and pollution of the city.
British-Era Planning:
Model Town was designed during the British colonial period, which is why it features wide roads, spacious parks, and a well-planned block system — all influenced by British-style urban planning.
After Pakistan’s Independence (1947):
When Pakistan was created, most of the original Hindu residents migrated to India, and the properties were allotted to new Muslim families who moved to Pakistan during the Partition. Since then, Model Town has grown into one of Lahore’s most prestigious and peaceful residential areas.
Is Model Town Society Approved by LDA?
No, Model Town Society Lahore is not directly approved by the LDA (Lahore Development Authority) because it is much older than LDA itself
Here’s Why:
Model Town was established in 1921, while LDA was formed much later in 1975.
So Model Town is a pre-LDA cooperative housing society, and it manages itself independently under its own Model Town Cooperative Society Act.
It has its own bylaws, management committee, and planning rules
But Is It Legal?
Yes, absolutely. Model Town is:
Fully legal
Recognized by the government
Considered a safe and premium residential area in Lahore
All utilities like electricity, gas, and water are fully available
Does Model Town Use WAPDA Electricity or Its Own?
Model Town Society Lahore uses electricity from WAPDA — just like most areas of Lahore.
It does not have its own private power generation system bill generate by model town society lahore
How It Works:
Electricity in Model Town is provided by LESCO (Lahore Electric Supply Company), which is a part of WAPDA.
Meter installation, billing, and maintenance are all handled by LESCO.
The society may have some backup generators or solar systems in certain blocks or offices, but the main power supply is from WAPDA
- bill generate by model town society lahore
For New Connections:
If someone wants to apply for a new electricity meter in Model Town:
They apply through LESCO.
Model Town Society might give a No Objection Certificate (NOC) or verify the property first.
After that, LESCO installs the meter and bill generate by model town society lahore
Popular Blocks:
Model Town is divided into Blocks A to K, and each block has its own market, masjid, parks, and community centers
Facilities & Amenities:
Schools (e.g., The Crescent Model, Lahore Grammar)
Hospitals (e.g., Model Town Hospital)
Shopping (Model Town Link Road, Main Boulevard)
Restaurants & Cafes
Gym, Libraries, Sports Grounds
model town construction
Model Town Society Construction Bylaws (Main Points)
1. Plot Coverage
Ground Floor: You can cover up to 60% to 65% of the total plot area.
First Floor: Same coverage as ground (must be within society limits).
Basement: Allowed, but must follow safety and drainage rules.
Setbacks (Khula Area around the house)
These are minimum empty spaces you must leave from plot boundaries:
| Plot Size | Front Setback | Back Setback | Side Setbacks |
|---|---|---|---|
| 1 Kanal | 10 ft | 7 ft | 5 ft (each side) |
| 10 Marla | 7 ft | 5 ft | 3 ft (each side) |
Society may vary this slightly block to block
Building Height
You can usually build Ground + First Floor (2 floors).
In some blocks, a mumty (small stair room on roof) is also allowed, but with height limits and 250sqft only
Boundary Wall
Maximum height: 5 feet solid wall + 1–2 feet grill or fence.
Front elevation must be clean and society-approved.
Car Porch & Driveway
You must leave space inside for parking at least one car.
No permanent ramps or steps allowed on the public road.
Basement Rules
You must submit basement structure plan.
Must have proper water drainage system.
Society approval is required before starting basement work.
Water Tank & Septic Tank
Underground water tank and septic tank placement must follow society’s rules.
Society often gives a standard layout
Construction Time Limit
Once you start construction, you must complete the house within 2 years.
If delayed, society may charge penalty or extension fees.
Drawings Approval
Before you start building, you must submit:
Site plan
Floor plan
Front elevation
Structure details
Society engineering department will approve the drawings.
Violation Penalties
If you violate construction rules (e.g., extra floors, illegal structures, zero setbacks), you may get:
Fine
Demolition notice
Suspension of utility services
Required Documents for Construction Approval:
Copy of ownership letter / transfer letter
CNIC of owner
Architecture drawings (from registered architect)
Undertaking & fee submission
- model town construction