you must finish all the work of the electrician, AC, and plumber. Cover all pipes, levers, valves with plastic so that spices do not get inside and do not freeze on top.
Check the bathroom and kitchen skylights. The exhaust fan has a wooden frame.
Make sure the door frames are installed in the correct position. The window safety grill should be ready. Check the size of all windows.
the plastered surface first. Hammer the overgrown bricks and frozen spices and fill with all the large standing brick pieces. It is more important to level the rough side of the wall. Rough the smooth surface of the concrete beams above the windows and doors with a hammer to hold the plaster on it. During shuttering, cut the remaining wires and remove the pieces of wood.
Lay chicken nets on the outer horizontal surface of the masonry and lantern joints so that the plaster does not crack later.
Thoroughly pat the wall the day before. Reapply before plastering.
Check all the walls. If any second brick is seen, tear it off and replace it with another one. All types of masonry should be completed.
Apply a sharp layer of pure cement on all surfaces.
Don’t use too thick or too fine sand. There should be no dirt in the sand. The sand should not be wet. Filter the sand with a mesh.
Season one to four.
Apply a dry mixture of sand and cement at least three times before making spices. Mix the dry spices well. Make the spices in a clean place.
Season four times a day. Don’t cook too many spices at once and keep them for too long.
An entire wall should be plastered in a day without joints.
Roll the plaster from top to bottom. Cement thickness ranged from three to six sutras.
Use SRC cement in the bottom three to four feet of plaster. Use only good heavy wood made from a local hot carpenter.
Get rid of a mechanic who uses plastic or Chinese heaters. Plaster is only a mason, not a laborer. Get rid of the clutter you don’t need.
Tie the strings. Then add spices. Arrange to keep the spices that fall down clean and use them as well. Use an aluminum flat to check the level. Use a light bulb to check the level.
Use new foam every day. Before House Plaster Instruction
Remove the used foam from the site daily or the mechanic will reuse it.
Apply safety grill on the same day and apply all the tips on the same day.
Fill the holes of goh on the same day and level the plaster.
Rough the plaster from the top where marble tiles or molds are to be applied later. Such as kitchens and bathrooms or front elevations.
Start plastering the next day and do it three times a day for seven consecutive days.
Check the daily plaster area and material quantity. More cement does not mean that the plaster is getting stronger. The masons and laborers may be wasting the material.
Check and correct the horizontal and vertical levels of the plaster at the same time.
Also, check the width of the rooms or the tiles will not fit straight in the floor.
Try to have the exterior surface plastered within two to three days of the interior surface of the room being plastered. This makes the wall very strong. Inside and outside, the wall is made of iron.
If the ceiling is to have false ceilings on the inside, do not plaster at all. It would be a waste of money.
Commit your chosen painter during the plastering to come for only five minutes every day to check the plaster done the day before. Later the painter will put all the bad quality debris on the plaster. Get rid of uneven, full, or raised areas within 24 hours.
Surveillance is the real work.
Quality is possible only with supervision.
The supervisor should have an understanding of all the work.